Steel Bridge Launch

A contractor erected a steel bridge using the launch method. The bridge owner/designer became concerned about the bridge’s structural integrity during the launch, and this concern became contentious. Our team independently evaluated the bridge launch sequence, identified specific code requirements, and evaluated bridge member stresses and stability. Our analysis considered both static loads and launch dynamic effects. The results of our study demonstrated that the structural integrity of the bridge was maintained throughout the launch sequence.

You may also like…

Stainless Steel Ball Float

Stainless Steel Ball Float

A hydraulic oil storage tank caught fire, which shut down a power plant. The root cause of the fire was attributed to...

Burst Spray Bottle

Burst Spray Bottle

A sprayer used for degreasing at a restaurant burst while in use injuring a worker. HEA was retained by the...

Warehouse Building Collapse

Warehouse Building Collapse

A large warehouse collapsed during a snowstorm in Tacoma. Based on observations of damage to warehouse support posts,...