The premiere showing of the new Disney production “Pirates of the Caribbean 3” required a 90′ wide by 40′ high screen to be installed on Tom Sawyer’s Island at Disneyland. HEA designed a guyed aluminum truss and scaffold structure to support the screen for sustained winds up to 30 mph.
Truss Stage Grid
The roof structure shown was purchased by Stage Tech from Total Structures,...