HEA performed a feasibility study and concluded the purchase of a new diesel crane was preferable to electrification of the existing crane. HEA developed the crane design specifications. HEA also designed the pedestal base frame and evaluated the existing pier slab and pile foundation. HEA served as the clients’ primary agent through the building, permitting and construction management.
Crane Rail Finite Elememt Analysis
A cantilevered steel rail with a unique support configuration and an atypical cross section required a more detailed...