A refinery FCC unit was to be demolished. HEA worked with the contractor to develop a suitable lift plan. This work included designing a suitable mat for crane operation, overturning calculations, lifting lug design and a structural analysis to identify suitable structure break points.
Crane Rail Finite Elememt Analysis
A cantilevered steel rail with a unique support configuration and an atypical cross section required a more detailed...