Crane Lift Plan Review

A refinery FCC unit was to be demolished. HEA worked with the contractor to develop a suitable lift plan. This work included designing a suitable mat for crane operation, overturning calculations, lifting lug design and a structural analysis to identify suitable structure break points.

You may also like…

Crane Collapse Analysis

Crane Collapse Analysis

A platform crane boom collapsed during a routine lift. HEA attributed the failure to the collapse of the dual mast...