Hopper Engineering Associates

  • Home
  • Services
  • About Us
  • Projects
  • Contact Us

Phone Number

310.373.5573
info@hopperengineering.com
  • Home
  • Services
  • About Us
  • Projects
  • Contact Us
Vibration Analysis and Remediation

Vibration Analysis and Remediation

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

The cause of repeated cracking in the welded connection of a pipe stub from an 8″ line to a bleeder valve was unknown. HEA attributed the failure to high fatigue stresses caused by resonant vibration of the valve. This vibration was traced to pressure pulsations...
Platform Analysis under Severe Seismic Load

Platform Analysis under Severe Seismic Load

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

The stability of a drilling platform, currently in the feasibility phase of development, is in question. The platform is supported by three composite legs embedded in the sea floor. The platform supports significant load from a drilling rig, drill pipe setback,...
Structural Repairs to Increase Service Life

Structural Repairs to Increase Service Life

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Ice severely damaged a horizontal brace of an oil platform jacket structure. HEA was tasked to determine the platform’s fitness for service and remaining life. HEA analyzed the local and global stresses associated with the observed damage. Global elastic...
Determining the Ultimate Capacity of an Outlet Collector

Determining the Ultimate Capacity of an Outlet Collector

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

The ultimate capacity of an existing outlet collector needed to be determined. HEA generated a finite element model of the outlet collector and a differential pressure load was applied. Our analysis considered material plasticity to find the ultimate collapse load. An...
Modifications to Reduce Thermal Stresses

Modifications to Reduce Thermal Stresses

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Multiple cracking and leak failures have occurred in tubing located within an oil refinery economizer. Metallurgical examination of the failed tubes indicates that corrosion fatigue is the most likely failure mechanism. HEA performed a finite element analysis and...
3D Model to Visualize Fluid Flow

3D Model to Visualize Fluid Flow

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

A J-tube previously used as a firewater source, located in a leg of an oil platform, was found to be plugged. A systems upgrade to the fire protection system requires a functional fire water pump at the leg. Flooding of the leg was under consideration as a solution....
« Older Entries
Next Entries »

Select an Industry

  • Heavy Load Handling
  • Insurance and Legal
  • Manufacturing
  • Petrochemical Refining and Production
  • Power Generation and Utilities
  • Productions, Venues, and Events
  • Shipbuilding and Marine
  • Show Rigging and Fall Protection

If you have a technical problem and think we might be able to help, please call us at 310.373.5573 to discuss how we can assist you or email one of our professional engineers.

Site Map

  • Home
  • Services
  • About Us
  • Projects
  • Contact Us

Contact Now

300 Vista Del Mar
Redondo Beach, CA. 90277
Phone: 310.373.5573
Fax: 310.791.7308

If you have a technical problem and think we might be able to help, please call us at 310.373.5573 to discuss how we can assist you or email one of our professional engineers.

Site Map

Home

Services

About Us

Projects

Contact Us

Contact

300 Vista Del Mar
Redondo Beach, CA. 90277
Phone: 310.373.5573
Fax: 310.791.7308