A Motor Operated Valve was replaced with a heavier valve, requiring reanalysis of the Pressurizer Valve Piping. HEA performed a Class 1 piping analysis considering dynamic fluid transient loading and thermal stratification effects.
Monorail Rake
Challenge: The Traversing Bar Rake System (TBRS) is a trash rack raking system for the intake structure of a power...