Challenge: New lightning arresters are required at a power plant. HEA was approached to perform an IEEE seismic qualification evaluation to demonstrate dynamic performance compatibility for as-tested versus as-installed configuration. Resolution: Our engineering team...
Pump Fragility Analysis

Pump Fragility Analysis

Challenge: The existing pumps need to be analyzed for seismic fragility. The developed seismic fragility will be performed using a 5% damped spectral acceleration. Resolution: The pumps were evaluated for the possible failure modes based on the design calculation. The...