Pump Intake Debris Screen Optimization

Pump Intake Debris Screen Optimization

by GeorgeWebManHopperE | Mar 27, 2021 | Petrochemical Refining and Production

Challenge: A refinery client uses seawater as the main supply for plant cooling operations as well as firewater for emergency situations. Depending upon storm activity and currents, significant seaweed and floating debris have been witnessed entering the intake...
Furnace No. 5 Foundation

Furnace No. 5 Foundation

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Challenge: Design a support foundation for a large reheat furnace being installed at a local steel manufacturing plant to increase their production output. The weight of the new furnace is measured in millions of pounds, with dozens of individual support points for...
Granite Point Ship Impact

Granite Point Ship Impact

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Challenge: A supply ship, the PSV Monarch, was involved in a collision with legs 1 and 4 of the Granite Point platform located in the Cook Inlet, Alaska. Due to damage to the ship incurred during the impact, the ship eventually took on water and sank. The incident...
Tidal Turbine Feasibility Study

Tidal Turbine Feasibility Study

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Challenge: Ocean currents flowing beneath offshore platforms provide a wealth of energy that has previously gone untapped. Recent developments in alternative and renewable energy have provided a number of options for energy production, including tidal turbine...
Offshore Platform – Diesel Firewater Caisson Wall Thinning Assessment

Offshore Platform – Diesel Firewater Caisson Wall Thinning Assessment

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Challenge: Assess the condition of a corroded Diesel Firewater Conductor Pipe (Caisson) located on an offshore platform. Determine if the caisson remains fit for service, if it does not then design a repair. Resolution: UT measurements were taken to determine the...
Fin-Fan Outlet Nozzle Wall Thinning Fitness-for-Service

Fin-Fan Outlet Nozzle Wall Thinning Fitness-for-Service

by GeorgeWebManHopperE | Mar 26, 2021 | Petrochemical Refining and Production

Challenge: Thinning of the weld material at a fin-fan outlet nozzle was identified during routine inspection. The client performed a Fitness-for-Service analysis in-house and found stresses in the component to be acceptable. However, per API 579 requirements the...
« Older Entries

Select an Industry

  • Heavy Load Handling
  • Insurance and Legal
  • Manufacturing
  • Petrochemical Refining and Production
  • Power Generation and Utilities
  • Productions, Venues, and Events
  • Shipbuilding and Marine
  • Show Rigging and Fall Protection

If you have a technical problem and think we might be able to help, please call us at 310.373.5573 to discuss how we can assist you or email one of our professional engineers.

Site Map

  • Home
  • Services
  • About Us
  • Projects
  • Contact Us

Contact Now

300 Vista Del Mar
Redondo Beach, CA. 90277
Phone: 310.373.5573
Fax: 310.791.7308

If you have a technical problem and think we might be able to help, please call us at 310.373.5573 to discuss how we can assist you or email one of our professional engineers.

Site Map

Home

Services

About Us

Projects

Contact Us

Contact

300 Vista Del Mar
Redondo Beach, CA. 90277
Phone: 310.373.5573
Fax: 310.791.7308