Coker Elevator Replacement

Coker Elevator Replacement

Challenge: An existing passenger elevator in the Coker unit of a local refinery is becoming increasingly unreliable due to age and limited availability of replacement parts. A new elevator is to be installed at the unit. Consideration is given to limit impact to...

Crossover Bridge

Crossover Bridge

Challenge: To design a new bridge to crossover a pipeway capable of supporting a large drilling rig. The bridge is within the facility of an oil refinery site; and only a single lane roadway is required. Design of the bridge shall meet requirements of AASHTO and...

Compressor Vibration Mitigation

Compressor Vibration Mitigation

Challenge: A large integral gas compressor onboard a drilling platform in the Cook Inlet was experiencing excessive vibration issues which prevented further use. Our purpose was to investigate the root cause of excessive vibration and determine a solution to mitigate...

Challenge: Existing piping will be subjected to hydro-testing to ensure the piping continues to operate in a safe manner. The piping runs across the bridge. A consultant evaluated the bridge for the additional loading. HEA was tasked to perform an unbiased technical...

Hose Room Optimization

Hose Room Optimization

Challenge: The amount of hoses running along the floor of an oil blending facility posed serious tripping hazards. It was also an operations nightmare to change hoses as it could take over an hour to trace and remove these very long and heavy hoses. The facility...