Weld Defect Evaluation

Weld Defect Evaluation

During construction of a new hospital, several cracked welds were observed and did not pass a required structural inspection. HEA was retained by a law firm on behalf of the contractor’s insurance carrier to determine the cause and origin of the weld failures....
Steam Flow Failure

Steam Flow Failure

A large extraction steam line failed at an operating power plant forcing the plant to shut down. The plant owner retained HEA to determine whether the cause of the failure was related to faulty installation or construction. Our investigation included mechanical stress...
Steel Bridge Launch

Steel Bridge Launch

A contractor erected a steel bridge using the launch method. The bridge owner/designer became concerned about the bridge’s structural integrity during the launch, and this concern became contentious. Our team independently evaluated the bridge launch sequence,...